| Name of Project : |
Structural Auditing & Consultancy with Preparation of B.O.Q. of existing Hospital
buildings at Talcher, Orrisa |
| Client : |
Design Associates Inc. |
| Time Taken for Completion of Project : |
3 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
|
| Name of Project : |
Structural Audit of EIA-Mumbai office building, Andheri (East), Mumbai |
| Client : |
Export Inspection Agency - Mumbai. |
| Time Taken for Completion of Project : |
1 Month |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
|
| Name of Project : |
BHEL -Bharat Heavy Electricals Limited, (BHEL) for Structural audit condition
assessment of overhead water reservoir & sump in BHEL, Township area and water reservoir at
jail Hill Filtration plant, Bhopal. |
| Client : |
BHEL. |
| Time Taken for Completion of Project : |
4 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
|
| Name of Project : |
Structural Audit to building Netaji "B" Co-Op Hsg. Society, Constructed under
PMGP at Dharavi Mumbai. |
| Client : |
MAHADA. |
| Time Taken for Completion of Project : |
2 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
|
| Name of Project : |
Offer for the professional services for the structural audit of Dona Paula Jetty at
Panjim, Goa. |
| Client : |
MES. |
| Time Taken for Completion of Project : |
2 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
- Core Test
|
| Name of Project : |
Structural audit of old bridge on kudus Kanchad road, state highway no. 35
ch.10/600, boranda bridge, Structural audit of old bridge on wada Bhiwandi road, state highway
no. 35 ch.69/100, Vaitarna river bridge, & Structural audit of old bridge on wada Bhiwandi road,
state highway no.35 at ch.52/800, tansa river bridge, In Taluka-wada, District-Palghar. |
| Client : |
PWD. |
| Time Taken for Completion of Project : |
3 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
- Load Test
|
| Name of Project : |
Non–Destructive Testing and Health Assessment of Various Civil structures of
PP, WIP and ETP&DC complex of NRG BARC Trombay, Mumbai |
| Client : |
BARC. |
| Time Taken for Completion of Project : |
8 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
- Core Test
|
| Name of Project : |
carrying out Structural Audit for Fire Affected NMNH building situated at "J"
Point of Barakhamba and Tansen Marg. |
| Client : |
FICCI. |
| Time Taken for Completion of Project : |
2 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
- Core Test
|
| Name of Project : |
Structural Repairs to CAO Building, Griha Nirman Bhavan, Kala Nagar, Bandra
(East), Mumbai - 51. |
| Client : |
MHADA. |
| Time Taken for Completion of Project : |
2 Months |
Scope of Work
- Carrying out the Structural Audit of the Building and by conducting NDT test, Visual Survey,
Photography of Major repair portions, Preparation of Estimate, Conclusion & Recommendation
Line of Action, Methodology of repairs, Material Specifications etc…
NDT Test Conducted
- Ultra Pulse Velocity (UPV)
- Schmidt Hammer Test
- Corrosion Test
- Half Cell Potential Test
|
| Name of Project : |
Proposed development of amenity bldg. on plot bearing C.S No. 749 (Pt) of
Mazgaon divn. MHADA Colony, Rambhau Bhogale Marg, Ghodapdev, 'E' Ward. |
| Client : |
MCGM. |
| Cost of Project: |
50Cr. |
| Time Taken for Completion of Project : |
3 Years |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
|
| Name of Project : |
Structural design of CSIR Building at Lokhandwala, Andheri (W), Mumbai |
| Client : |
Design Associates Inc.. |
| Cost of Project: |
80Cr. |
| Time Taken for Completion of Project : |
3 Years |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
|
| Name of Project : |
Structural Consultancy, MCGM License Structural Consultancy, Proof Structural
Checking from IIT Mumbai, issuing Structural stability Certificate while obtaining BCC with
supervision on RCC for ESIS Staff Quarter Building at Andheri, Mumbai |
| Client : |
Design Associates Inc.. |
| Cost of Project: |
110 Cr. |
| Time Taken for Completion of Project : |
3 Years |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
|
| Name of Project : |
Preparation of Structural Design and detailed estimate for Construction of
Administrative Building at Mohadi & Tumsar |
| Client : |
PWD. |
| Time Taken for Completion of Project : |
2 Months |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
|
| Name of Project : |
Project Management Consultancy (P.M.C.) of our Factory & Office bldg. on plot
no.36, MIDC, Addl. Ambernath. Dis.-Thane |
| Client : |
Warkem Biotech Pvt. Ltd. |
| Cost of Project: : |
13.08 Cr. |
| Time Taken for Completion of Project : |
2 Years |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
- Landscaping
|
| Name of Project : |
Project Management Consultancy (P.M.C.) of our Factory ,office & Warehouse
Bldg,,plot no.B-4,5,6,Hi Media Laboratories at Palkhed Dindori M.I.D.C.,Nashik |
| Client : |
Hi Media Laboratories Pvt. Ltd.. |
| Cost of Project: : |
20.05 Cr. |
| Time Taken for Completion of Project : |
4 Years |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
- Landscaping
|
| Name of Project : |
Consultancy Services for Structural Audit / Issuing Stability Certificate as
required u/s 353-B of MMC Act 1888 for Undertaking's structures under the jurisdiction Various
Lots |
| Client : |
BEST. |
| Cost of Project: : |
50 Cr. |
| Time Taken for Completion of Project : |
4 Years |
Scope of Work
- Polymer Modified Mortar was used to rebuild damaged RCC section up to 25 to 50 mm
- Micro concrete was used to rebuild damaged RCC section up to 50 to 100 mm
- Seismic Retrofitting work was carried out by Jacketing External Columns and Beams
- Seismic Retrofitting work was carried out by demolishing and recasting the terrace level
slabs
|
| Name of Project : |
Project Management Consultancy (P.M.C.) of our Factory & Office bldg on plot
no.36,MIDC, Addl. Ambernath. Dis.-Thane |
| Client : |
Warkem Biotech Pvt. Ltd. |
| Cost of Project: : |
13.08 Cr. |
| Time Taken for Completion of Project : |
2 Years |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
- Landscaping
|
| Name of Project : |
Project Management Consultancy (P.M.C.) of our Factory ,office & Warehouse
Bldg,,plot no.B-4,5,6,Hi Media Laboratoriesat Palkhed Dindori M.I.D.C.,Nashik |
| Client : |
Hi Media Laboratories Pvt. Ltd. |
| Cost of Project: : |
20.05 Cr. |
| Time Taken for Completion of Project : |
4 Years |
Scope of Work
- RCC frame structure Office cum R&D buildings with Ground + 2 Upper floors
- Chemical Warehouse with part ground with 8.5 mtrs. Height and part RCC frame structure
with Ground + 2 Upper floors
- RCC frame structure factory building of Ground + 2 Upper floors with inner courtyard
covered with Dome Structure.
- All Internal road layouts with parking arrangement with entrances for In & Out vehicle
traffic.
- Landscaping
|
| Name of Project : |
Structural Repairs to CAO Building, Griha Nirman Bhavan, Kala Nagar, Bandra
(East), Mumbai - 51 (Phase I - II). |
| Client : |
MHADA.. |
| Owner : |
MHADA.. |
| Cost of Project: : |
21 Cr. |
| Time Taken for Completion of Project : |
4 Years |
| Major Issue: |
Building cannot be vacated as at any given time the occupancy was at least 90 to 95 %. |
Scope of Work
- Polymer Modified Mortar was used to rebuild damaged RCC section up to 25 to 50 mm
- Micro concrete was used to rebuild damaged RCC section up to 50 to 100 mm
- Seismic Retrofitting work was carried out by Jacketing External Columns and Beams
- Seismic Retrofitting work was carried out by demolishing and recasting the terrace level
slabs
- Seismic Retrofitting work was carried out by FRP Wrapping
|
| Name of Project : |
Consultancy Services for Structural repairs to columns, south side shear wall,
west side pavement slab and painting of Sanchar Bhavan, 20, Ashoka Road, New Delhi |
| Client : |
BSNL. |
| Time Taken for Completion of Project : |
3 Years |
Scope of Work
- Polymer Modified Mortar was used to rebuild damaged RCC section up to 25 to 50 mm
- Micro concrete was used to rebuild damaged RCC section up to 50 to 100 mm
- Seismic Retrofitting work was carried out by Jacketing External Columns and Beams
- Seismic Retrofitting work was carried out by demolishing and recasting the terrace level
slabs
|
| Name of Project : |
Consultancy Services for Structural Audit / Issuing Stability Certificate as
required u/s 353-B of MMC Act 1888 for Undertaking's structures under the jurisdiction of
M/West, N & T Wards of MCGM [Lot-VI] |
| Client : |
BEST. |
| Time Taken for Completion of Project : |
2 Years |
Scope of Work
- Polymer Modified Mortar was used to rebuild damaged RCC section up to 25 to 50 mm
- Micro concrete was used to rebuild damaged RCC section up to 50 to 100 mm
- Seismic Retrofitting work was carried out by Jacketing External Columns and Beams
- Seismic Retrofitting work was carried out by demolishing and recasting the terrace level
slabs
|
| Name of Project : |
Consultancy Services for Structural Audit / Issuing Stability Certificate as
required u/s 353-B of MMC Act 1888 for Undertaking's structures under the jurisdiction of
H/West, K/East & R/South Wards of MCGM [Lot-IV] |
| Client : |
BEST.. |
| Time Taken for Completion of Project : |
2 Years |
Scope of Work
- Polymer Modified Mortar was used to rebuild damaged RCC section up to 25 to 50 mm
- Micro concrete was used to rebuild damaged RCC section up to 50 to 100 mm
- Seismic Retrofitting work was carried out by Jacketing External Columns and Beams
- Seismic Retrofitting work was carried out by demolishing and recasting the terrace level
slabs
|
| Name of Project : |
Structural Repairs to CAO Building, Griha Nirman Bhavan, Kala Nagar, Bandra
(East), Mumbai - 51 (Phase I - II). |
| Client : |
MHADA. |
| Owner : |
MHADA. |
| Cost of Project : |
21 Cr. |
| Time Taken for Completion of Project : |
4 Years |
| Major Issue: |
Building cannot be vacated as at any given time the occupancy was at least 90 to 95 %. |
Scope of Work
- Polymer Modified Mortar was used to rebuild damaged RCC section up to 25 to 50 mm
- Micro concrete was used to rebuild damaged RCC section up to 50 to 100 mm
- Seismic Retrofitting work was carried out by Jacketing External Columns and Beams
- Seismic Retrofitting work was carried out by demolishing and recasting the terrace level
slabs
- Seismic Retrofitting work was carried out by FRP Wrapping
|
| Name of Project : |
Consultancy Services for Structural Audit / Issuing Stability Certificate as
required u/s 353-B of MMC Act 1888 for Undertaking's structures under the jurisdiction of E (part
3) & F / South Wards of MCGM [Lot-III] |
| Client : |
BEST. |
| Time Taken for Completion of Project : |
2 Years |
Scope of Work
- Polymer Modified Mortar was used to rebuild damaged RCC section up to 25 to 50 mm
- Micro concrete was used to rebuild damaged RCC section up to 50 to 100 mm
- Seismic Retrofitting work was carried out by Jacketing External Columns and Beams
- Seismic Retrofitting work was carried out by demolishing and recasting the terrace level
slabs
|